Job Category
Translation: Persian » English
:Activity categories
Usually work in this category are divided into two parts: the value of productive work are non-productive
Distinction between productive and non productive work is important because manufacturing Charge will be added to finished products, while regarded as non-manufacturing costs are considered period
:Responsible for classification
This work can be classified according to the circle or workshop divided into parts, for example: the work of a factory can be Dvayr Terra Share hunting and to Mmtazh. And each circle as a Responsibility Center considered. Classified based on the responsibilities effectively control the costs are salary. As carers and part Dvayr how to do responsible cost workers and their parts have been realized.
Classification of detection:
The classification work of direct and indirect work is divided. Direct wage inflation that work aimed at the detection of the economic costs affordable. Wage costs, such as turning in a circle Terra hunting and non-wage labor is expensive direct detection of the direct target of the economic cost is not economical. Work as wage inflation that produced the product line are transferred to the warehouse.
+ نوشته شده در پنجشنبه نوزدهم شهریور ۱۳۸۸ ساعت 12:17 توسط محمدرضا ملک زاده
|
با سلام ! از آنجا که بخش مهمی از هزینه های واحد های تولیدی و خدماتی را هزینه ی حقوق و دستمزد متحمل می شود کنترل و طبقه بندی مناسب این هزینه و نیز آشنایی علمی با این هزینه از اهمیت ویژه ای برخوردار است . این وبلاگ نیز با هدف ارتقاء سطح علمی کنترل این هزینه ساخته شده است.